Part A: ASTM Transformer Oil Tests. Latest Update: Impact of current COVID-19 situation has been considered in this report while making the analysis. Transformer oil is not any ordinary oil. We would like to inform you of our transformer oil testing service based at Acacia Ridge in the south side of Brisbane. Home » Reports » Global Transformer Oil Testing Market Report, History and Forecast 2019-2026, Breakdown Data by Companies, Key Regions, Types and Application. Special tests help to provide useful information to the user. This is because it tends to deteriorate over time. Online DGA test kit (Image credit: MTE Meter Test Equipment, Switzerland) Online method is adopted for large transformer. PCB’s: Polychlorinated Biphenyls. Its use to call transformer oil and it a little bit pricey. Through oil testing, transformers' life can be substantially increased, thus delaying new investment of replacement transformer assets. Oil Tests . If all the above tests/checks are found satisfactory, a settling time of at least 24 hours, should be allowed for the oil and air released from all points at six hourly intervals, before commissioning the transformer. Transformer Oil Test Report - Free download as PDF File (.pdf), Text File (.txt) or read online for free. All other oil test results must be recorded in the following network drive: G:\Oildata. Whenever possible, while commissioning, the voltage should be build up slowly and brought to the full level in about 4 to 6 hours. This facility is supported by the Engineering Department of the GE Worldwide Transformer factories and services client’s needs for testing oil, paper insulation from all types of transformers filled with all types of insulating fluids. In the offline method, during maintenance or after fault, oil sample from transformer is collected and than tested in portable DGA test kit or sent to laboratory. That means we have the capability and capacity to provide effective, accurate test results quickly. Transformer oil or insulating oil is an oil that is stable at high temperatures and has excellent electrical insulating properties. By the Furan analysis, we check the condition of paper in transformer oil. your transformer oil is within specifications and diagnose internal faults inside the paper, windings, and core. Which types of insulating oil can be tested? Transformer oil testing is one of the important parts of a power transformer.This test will be performed when your power transformer cooling system is an oil type. Various electrical tests must be performed and their significance and short description are given below. Transformer Acidity Test | transformer acidity test youtube | transformer acidity test video - Duration: 2:23. Global Transformer Oil Testing Market Report 2020 has complete details about market of Transformer Oil Testing industry, Transformer Oil Testing analysis and current trends. 2. The DGA test measures dissolved gases in the transformer oil and is capable of detecting: arcing, bad electrical contacts, hot spots, partial discharges, overheating of conductors, oil, tank, and cellulose (paper insulation) degradation. First impressions count For the ultimate peace of mind, our Mobile Diagnostic Technicians (MDTs) perform in-depth visual inspections and provide easy-to-understand reports via your own customized Transformer Dashboard ®. Oil Diagnostic Suites for Transformer Oil Diagnostics: The above standard testing is offered in specific diagnostic suites designed to provide the maximum condition information on the transformers. Furan measures the degradation of cellulose paper. The Furan Analysis Process. Tractor test reports from the following manufacturers from 1999 to current date are available in .pdf format. HSB’s screen tests include: Dielectric breakdown, Power factor, Interfacial tension, Acidity, Color, Specific gravity. Hacı Sabancı Organize Sanayi Bölgesi Anafartalar Cad. Originally used for their excellent electrical characteristics and not being flammable. Transformer oil, a type of insulating and cooling oil used in transformers and other electrical equipment, needs to be tested periodically to ensure that it is still fit for purpose.